Introduce
Covering a total floor area of 10,600sqm, Yulin Yuyang Airport was built in 1958 with two terminal buildings, T1 and T2, and a runway of up to 2,800 meters long. The project adopts the Wiskind Architectural Steel Cold Storage Systems Roof Systems - Al-Mg-Mn roofing system products, which boasts multiple advantages such as corrosion resistance, aesthetic appearance, light weight, high strength, easy processing and forming, thus significantly improving the construction efficiency while reducing the cost.